So that the plaster is strong and high -quality, it is important not only to apply it correctly, but also to properly prepare the room for work.
The first thing to remember is that at the stage of preparing the premises all possible wet work should be completed. If plastering is carried out in the room where the work is still carried out, for example, on the installation of floor screed, you risk unnecessarily waterlogging plaster applied to the surface of the walls or ceiling, which will inevitably lead to its cracking. The plaster of the room begins only when the screed grabbed well, regardless of the moist regime and weather conditions.
Before plastering the walls and ceilings, do not forget to perform all the electrical work of Kyiv, lay the power supply, the alarm cable, if one is planned. Cover the distribution boxes with special caps to avoid pollution of power wires.
Also, even before the start of plaster business, it is necessary to wiring the pipelines of the sewage system, water and heating. Pipic sections in order to avoid pollution and entertaining foreign bodies must also be protected with special lids or polyethylene.
It is important to remember that when performing plaster work, drafts should be absent, all open windows and doors must be tightly closed with a film or plywood. In the event that the house already has window and door structures, they need to be protected from possible pollution.