The fact that the economic crisis in our country is drawing to an end in our country is evidenced by the emergence of a large number of construction projects. Today, without much difficulty, it can be observed that new buildings again, as in the pre -crisis period, began to appear again, both “mushrooms after the rain”, and this applies to both residential buildings and commercial buildings, offices, warehouses, and t. D.At the same time, it should be noted that the quality control of construction work is an integral procedure for each building under construction, since the safety of operation in the future depends on this. And therefore, it is necessary to focus on the fact that control measures originate even while the building takes place, and they end only after the object passes through all acceptance tests.
That is why, it should be noted that if it were carried out by the quality of construction work and the entire range of actions and events closely related to it, the buildings would pose a huge threat and danger to people. It should be noted that the quality control of construction work gives a huge advantage, since thanks to all these works it is possible to develop and ensure a high level of buildings. In addition, this largely affects the formation of aesthetically attractive appearance of the building, modern design, and a harmonious combination with the objects surrounding it, and buildings.
The main stages at which the quality of construction work is carried out by the development of regulatory documentation, and it is also very important to use control during design, it is also of great importance in the manufacture of building materials. The control is also very important when carrying out directly construction and installation works.