After we poured a solution (filling the floor screed) for screed on the stove and leveled it on the beacons, you need to let it dry, and then proceed to the dismantling of the lighthouses. Typically, the beacons are dismantled the day after laying the floor screed, and the traces remaining after them are primed and ground with a solution. It is necessary to monitor the condition of the screed within ten days, and caring for it consists in daily moistening, to prevent the drying of the cement included in the solution, until it acquires the strength.
To prevent the arrival of the screed, it is impossible to accelerate the process of drying it in any way.
When we completed all the work, the next necessary action will be – a control check of the screed. Which should have a perfectly even surface and uniform color, and also do not have cracks and hillocks.
It is possible to determine how much, the installation of the floor screed is even using the Raiki-Raid, which should be applied, in several places, to the screed, in different directions. 4 mm is a threshold of abnormalities.
To verify the presence of voids, the surface of the screed must be tapped, the knock should have the same sound over the entire surface of the screed. In places in which, when hit, a dull sound is observed, there is a deviation, which is unacceptable.
The material belongs