Construction

Installation of a plastic window – stages

When installing a plastic window, the technology should be carefully observed, only in this case the work will be done qualitatively.

Opening order: • Before installing the window should be prepared; • For fasteners, you need to drill holes in window frames • To protect against atmospheric moisture, you need to glue a vapor -permeable seal on the ends of the window. Then, along the perimeter of the frame, glue a waterproofing butyle-cummary tape, which is warmed up with a construction hair dryer before the sticker.• Rama is installed in the opening, fixing with spacer wedges. The outer edge of the frame should be removed from the edge of the outer wall at least 12 cm. The gap between the wall and the window should not be more than 4cm.• Horizontal and vertical lines of the window are aligned using the level.• The frame is fixed in the opening using fasteners – pads and anchor mounts. Anchors are selected in accordance with construction standards (GOST 30674-99). Anchor fixing depth of at least 4 cm. The fasteners are pulled out gradually in order to prevent distortions and bending of the profile, during installation, the levels of vertical and horizontal lines should be regularly checked.• Now you need to remove all auxiliary installation parts – wedges and liners. The pads are buried in the wall about a centimeter and a half.• The tide is attached using self -tapping screws to the frame and to the wall using anchors. The distance between the screws should be 20 cm.• It’s time to install the windowsill, you need to ensure that the distance from the windowsill to the heating radiator is not less than 12 cm.• Windows are installed in the static sections of the windows, then the opening wings are hung. Sometimes, due to installed double-glazed windows, it is inconvenient to complete the work on the installation of windows, in which case they are inserted later.• Fill the abandoned gaps between the wall and the frame with polyurethane construction foam. The seams should be filled with two -thirds of the depth, since the foam increases greatly in the volume. If the window could not be set correctly, and the gap turned out more than 4 cm, additional gaskets from the planks or plate polystyrene plates should be applied.• fix the details of accessories – handles, locks, etc.• install decorative and protective parts on window loops and anchor, which will be visible with open frames.

Related posts
Construction

Technology of installation of steel columns and rules

Steel columns are usually mounted on a reinforced concrete foundation, the type of which is determined depending on the weight of the…
Construction

Installation of metal structures: rules, tips and features

Metal structures play a key role in modern construction, providing strength, durability and flexibility of architectural solutions.
Construction

Installation of building structures: what you need to know and advice

The installation of building structures is a complex mechanized process of flow assembly of buildings and structures from factory-made elements and structural…