None of the floor decoration methods can do without such a preliminary procedure as the floor screed. The fact is that no matter how ideal and high -quality the material for covering the floor is, all the work will be a drain if the basis for it is a curve and a bugrist.
That is why it is very important with all responsibility to approach the thorough leveling of the floor. This procedure can be entrusted to professional craftsmen, but you must agree – the result will please at times more if you do everything with your own hands. Moreover, to make a floor screed, provided that all the nuances are within the force of almost any person who at least once in his life made repairs on his own.
For floor screed, a cement solution is used, for which the cement of the brand 400, mixed with sand (1 to 3) is suitable. To improve the characteristics of the solution, you can add a plasticizer. Using a reinforced net, the quality and durability of the floor increases significantly.
Remember that the prepared cement solution is suitable for use only for two hours. In addition, the filling of the mixture cannot be stretched for several days – everything needs to be done in one entry.
It should be noted that today it is not at all necessary to prepare a mixture for the solution yourself: on sale you can find a ready -made mixture called “Liquid Paul”. It is enough to make the solution, guided by the instructions, and then level the surface with a gear roller.